In more than 160 years, the factory site developed its own structure. Two complete building blocks and other buildings are distributed over an area of around 20 hectares, some of which are nested. Some of the buildings have different eras and structures.
The administration and research centre dates back to the 70s. The high-rise building will be renovated from 2017 July to the end of 2018 and upgraded in terms of fire protection. The floors were constructed with Robertson steel cell ceilings. In simple terms, the steel trapezoidal sheets are filled with concrete and provided with 5 to 6 cm thick concrete. The concrete filled into the beads of the trapezoidal sheet is difficult to compact in the existing building. Therefore, an unknown concrete strength must be assumed. Steel cell ceilings can only be used in multi-storey buildings if they are protected from fire by underside cladding. This is implemented during the renovation measure by a two-layer Promat cladding.
However, a disadvantage of Robertson ceilings with fire-resistant clothing is that utilities are barely possible within the suspended ceilings. The project-executing agency was all the more impressed by the concept proposed by fischer: fischer’s fastening systems anchor carrier strips of the two-layer Promat cladding for fire protection. A fish installation rail grid system FUS is mounted underneath, which serves as a carrier system for all other installation systems.